Aeon
 
 
 
Home Products Search
 

Aeon Product Browser


Select a product or search here.

Tulane CEGS system upgrade 2021
PN
Source
Unit
Price
Notes

Bill Of Materials Qty Unit Total Notes
actuator controller 64 channel 1 ea 725.90
actuator low flow valve 1 ea 210.54
actuator medium flow valve 4 ea 859.00
adapter 1/2 Swagelok x 3/8 tube 2 ea 47.46 pCT, cfVTT
cable, serial 3-wire ribbon 2 ea 26.32
coil trap 1 ea 262.39
elbow SS 3/8 x 1/4 1 ea 46.86
Excelon SL tubing 250 x 125 48 in 2.40
FEP tubing 250 x 031 48 in 10.08
fixed travel fee 384.54 $ 384.54 5 days, 6 nights, accommodations provided
freight 88.36 $ 88.36 LN phase separator
heater controller 12 channel 1 ea 562.34
heater controller 6 channel 1 ea 274.98
labor consulting 40 hr 5,600.00 on-site installation, configuration, process code
labor software development 32 hr 4,480.00 off-site, configuration and process code upgrades
LN phase separator 1 ea 183.48
low flow valve 1/4 angle modified 1 ea 173.66
medium flow valve 1/4 angle modified 1 ea 160.87
medium flow valve 1/4 modified 1 ea 210.98
Molex housing pin F 22-24 AWG high force 24 ea 5.04
ORS seat 1/2 x 0.224 2 ea 5.26 pCT, cfVTT
ORS seat 1/4 x 0.112 1 ea 2.63 CT outlet
ORS seat 3/8 x 0.109 1 ea 3.38 CT inlet
port connector 3/8 x 1/4 1 ea 13.35
spacer 4MFV positive stop 3 ea 5.37
SS316 EP tubing 375 x 035 10 in 8.10 3 + 7
Swagelok flow valve repair 3 ea 78.00
switchbank 16 channel 1 ea 404.57
tee SS 3/8 1 ea 44.62
USB Hub 10 port 1 ea 81.70
USB-RS232 adapter 2 ea 12.44 AC64 dCOM, SB16
Tulane CEGS system upgrade 2021 1 ea 14,974.62

Used on Qty
 
About Us | Contact Us