Bill Of Materials |
Qty |
Unit |
Total |
Notes |
CEGS Assembly and Test |
1 |
ea |
22,040.00 |
|
CEGS Operating Manual |
1 |
ea |
0.00 |
|
Control Section LL6x1+1i+VP |
1 |
ea |
5,722.67 |
|
Frame LL6x1+1i+VP |
1 |
ea |
1,056.28 |
|
FT gas side LL |
1 |
ea |
3,263.85 |
|
GM Section LL6 |
1 |
ea |
9,947.71 |
|
IM Section LL1+1i |
1 |
ea |
3,996.66 |
|
LN+air Section 6x11 |
1 |
ea |
3,141.55 |
|
Process Section LR 13C LL |
1 |
ea |
12,842.50 |
|
TF outlet LL |
1 |
ea |
3,601.29 |
|
tube furnace + fittings |
1 |
ea |
11,544.81 |
|
tube kit LL6x1+1i+VP |
1 |
ea |
1,351.78 |
|
Vacuum Section LR |
1 |
ea |
21,403.44 |
|
vial port low level |
1 |
ea |
2,741.14 |
|
CEGS LL6x1+1i+VP |
1 |
ea |
102,653.68 | |