Bill Of Materials |
Qty |
Unit |
Total |
Notes |
CEGS Assembly and Test |
1 |
ea |
22,040.00 |
|
CEGS Operating Manual |
1 |
ea |
0.00 |
|
CO2 analyzer mounted |
1 |
ea |
11,379.96 |
|
Control Section LL6x1+1i+6VP+RPO |
1 |
ea |
6,291.40 |
|
Frame LL6x1+1i+6VP+RPO |
1 |
ea |
1,213.42 |
|
FT gas dual out LL |
1 |
ea |
3,932.78 |
|
GM Section LL6 |
1 |
ea |
9,892.15 |
|
IM Section LL1 +1i OB |
1 |
ea |
4,029.42 |
|
LN+air Section 12X |
1 |
ea |
5,049.99 |
|
Process Section 2CT 13C LL |
1 |
ea |
20,550.86 |
|
TF outlet LL |
1 |
ea |
3,482.62 |
|
tube furnace + fittings |
1 |
ea |
11,544.78 |
|
tube kit 6x1+1i+6VP-RPO |
1 |
ea |
1,844.22 |
|
Vacuum Section dual |
1 |
ea |
39,284.48 |
|
vial port 6x low level |
1 |
ea |
7,364.54 |
|
CEGS LL6X1+1i+6VP+RPO |
1 |
ea |
147,900.62 | |