Bill Of Materials |
Qty |
Unit |
Total |
Notes |
CEGS Assembly and Test |
1 |
ea |
22,040.00 |
|
CEGS Operating Manual |
1 |
ea |
0.00 |
|
CO2 analyzer mounted |
1 |
ea |
11,379.96 |
|
Control Section LL6x1+1i+6VP+RPO |
1 |
ea |
6,419.76 |
|
Frame LL6x1+1i+6VP+RPO |
1 |
ea |
1,220.02 |
|
FT gas dual out LL |
1 |
ea |
4,070.36 |
|
GM Section LL6 |
1 |
ea |
9,947.71 |
|
IM Section LL1 +1i OB |
1 |
ea |
4,050.23 |
|
LN+air Section 12X |
1 |
ea |
5,323.44 |
|
Process Section 2CT 13C LL |
1 |
ea |
20,820.35 |
|
TF outlet LL |
1 |
ea |
3,601.29 |
|
tube furnace + fittings |
1 |
ea |
11,544.81 |
|
tube kit 6x1+1i+6VP-RPO |
1 |
ea |
1,844.22 |
|
Vacuum Section dual |
1 |
ea |
39,347.95 |
|
vial port 6x low level |
1 |
ea |
7,461.46 |
|
CEGS LL6X1+1i+6VP+RPO |
1 |
ea |
149,071.56 | |