Bill Of Materials | Qty | Unit | Total | Notes |
CEGS Assembly and Test | 1 | ea | 22,040.00 | |
CEGS Operating Manual | 1 | ea | 0.00 | |
CO2 analyzer mounted | 1 | ea | 11,379.96 | |
Control Section 12x1+5+6AP+RPO | 1 | ea | 6,437.80 | |
Frame LL12x1+5+6AP+RPO | 1 | ea | 1,099.17 | |
FT gas down | 1 | ea | 1,614.71 | |
GM Section LL12 | 1 | ea | 21,137.30 | |
IM Section LL1+5 OB | 1 | ea | 7,689.79 | |
LN+air Section 12x22 | 1 | ea | 5,977.81 | |
Process Section 2CT 13C LL | 1 | ea | 20,549.12 | |
Vacuum Section dual | 1 | ea | 39,284.48 | |
CEGS LL12x1+5+6AP+RPO | 1 | ea | 137,210.14 |
Used on | Qty |