Bill Of Materials | Qty | Unit | Total | Notes |
CEGS Assembly and Test | 1 | ea | 22,040.00 | |
CEGS Operating Manual | 1 | ea | 0.00 | |
CO2 analyzer mounted | 1 | ea | 15,717.88 | |
Control Section LL6x1+1i+6VP+RPO | 1 | ea | 6,582.14 | |
Frame LL6x1+1i+6VP+RPO | 1 | ea | 1,313.26 | |
FT gas dual out LL | 1 | ea | 4,139.54 | |
GM Section LL6 | 1 | ea | 10,476.37 | |
IM Section LL1 +1i OB | 1 | ea | 4,710.77 | |
LN+air Section 12X | 1 | ea | 5,362.76 | |
Process Section 2CT 13C LL | 1 | ea | 21,078.56 | |
TF outlet LL | 1 | ea | 3,668.13 | |
tube furnace + fittings | 1 | ea | 15,047.58 | |
tube kit 6x1+1i+6VP-RPO | 1 | ea | 2,250.91 | |
Vacuum Section dual | 1 | ea | 39,177.99 | |
vial port 6x low level | 1 | ea | 7,525.05 | |
CEGS LL6X1+1i+6VP+RPO | 1 | ea | 159,090.94 |
Used on | Qty |
CEGS {Mines} | 1 |
CEGS (LL6X1+1i+6VP+RPO) | 1 |